
Concept and preliminary design | Service phase 1 + 2
- Clarification of the task
- Site inspection
- Brainstorming, hand sketches
- Collage/mood board (atmosphere, style, materials)
- Development of a planning concept with variants
- Cost estimate
- Preliminary building enquiry
Design planning | Service phase 3
- As-built survey and 3D modelling
- Scaled drawings of the entire design (based on surveying documents or
as-built plans) - Creation of site plan, floor plans, views and sections
- Arrangement of furniture and furnishings
- Creation of 3D visualisation, 360° panorama, video tour
- Planning of material and colour concept
- Planning of lighting concept
- Planning of furniture concept
- Creation of shopping lists (furnishing list with direct shopping links)
- Selection of furniture, decorative items and works of art
- Cost calculation and design presentation
- Sampling
- Customised furniture design
Approval drawings and building application | service phase 4
- Preparing, compiling and submitting the templates and evidence for approvals by
the responsible building authority - Supplementing and adapting the planning documents, descriptions and calculations
Planning and preparations for contract award | service phase 5 + 6 + 7
- Execution, detail and construction drawings according to the type and size of the property in the required
scope and level of detail:- Demolition plan, dry construction plan, electrical plan, floor plan, ceiling plan, joint plan, ventilation plan, wall development, window and door list, floor structure, details
- Review and approval of work planning
- Preparation of schedules
- Coordination with the specialists involved
- Preparation of tender documents, quantity surveys
- Obtaining, checking and evaluating tenders
- Participation in the awarding of contracts
- Cost control
Construction supervision and coordination | service phase 8 + 9
- Quality monitoring of the property for compliance with the execution documents and
approvals - Coordinating the trades on site
- Updating the schedule, keeping a construction diary
- Acceptance, invoice verification and cost control
- Organisation of official acceptances
- Handover of the property
